Brick factory, Belgorod Region, Russia

Facts & Figures
| Genset / gas engine: | 5 x TCG 2020 V16 K | 
| Segment / gas type: | Natural gas | 
| Customer: | JSC StandardCement | 
| Total output: | 7.5 MWel / 7.5 MWth | 
| Commissioning: | 2016 | 
In 2016, a 7.5 MW mini-CHP plant was put into operation in the Belgorod region. The power plant consists of 5 gensets in a container design with a heat recovery system and is used for power supply of the needs of a brick factory. The site is operated in a fully island mode, in parallel with the 1.5 MW diesel genset.




































