References
MWM has rolled out projects of all sizes around the globe, installing small biogas gensets as well as power plants with an output of more than 50 MWel.
“Der Grashof” nursery – KBB Biogas GmbH & Co. KG, Kirchlinteln, Germany
The plant has a thermal output of 3.5 million kWh per year, so it covers more than 40 % of our heating needs. The MWM TCG 2016 V12 C gas engine is unbeatable when it comes to system and operating efficiency.
Anderlingen-Ohrel, Germany
A container-hosted TCG 2016 V08 C generates 3,200 MWh of power and 2,552 MWh of heat a year, which are used for the biogas plant.
Bioenergie Fargau GmbH & Co. KG, Fargau/Plön, Germany
The plant achieves power production of 3.7 million kWh and a thermal output of 3 million kWh per year. The utilization of thermal energy is practically 100%.
Bioenergie Hack Verwaltungsgesellschaft mbH, Wentorf
The biogas plant runs on a 50/50 mix of cattle manure from the farm’s dairy cows and corn grown on the fields. In addition to the TCG 3016, a smaller MWM genset with an output of 400 kWel is installed.
Biogas Park Altmark, Danpower Energy Service GmbH, Potsdam, Germany
Per year and plant, some 10,000 t of energy crops are used in the Biogas Park Altmark. These are supplied by farms from the region.
Biogas Plant Géotexia, France
The biogas plant in the Bretagne, France uses pork manure and industrial fats to produce around 700m3 of biogas per hour. The biogas is used in 2 containerized TCG 2016 V16 C.
Biogas Plant Saramzalino, North Macedonia
The biogas plant in Lozovo, North-Macedonia, with its two TCG 2020 V12 gas engines is able to supply approximately 4.000 households with electrical energy.
BIOgasfarm GmbH Projekt Löberitz, Germany
The biogas plant has an electrical output of 600 kW and is operated using farm slurry, farmyard manure and plant-derived biomass material in the form of maize silage.
CHP Plant, Kletkamp Farm, Germany
Nawaro Kletkamp GmbH & Co. KG uses a biogas CHP plant. Every day, about 20 tons of corn silage are used as input substance.
CornTec Biogas-Langenau GmbH & Co. KG, CornTec Biogas-Seligweiler GmbH & Co. KG
After some 70,000 operating hours, the oldest cogeneration power plant in Langenau was modernized with an MWM TCG 3016 V16 gas engine in the fall of 2018. About a year later, the gas engine in Seligweiler was also replaced with a new MWM TCG 3016 V16 power genset.