References
MWM has rolled out projects of all sizes around the globe, installing small biogas gensets as well as power plants with an output of more than 50 MWel.
“Der Grashof” nursery – KBB Biogas GmbH & Co. KG, Kirchlinteln, Germany
The plant has a thermal output of 3.5 million kWh per year, so it covers more than 40 % of our heating needs. The MWM TCG 2016 V12 C gas engine is unbeatable when it comes to system and operating efficiency.
Bioenergie Oberspiesheim, Germany
The new cogeneration power plant working of the biogas plant in Oberspiesheim in the Nuremberg metropolitan area is equipped with an MWM TCG 2020 V12 gas engine and is working in flexible operation.
Delta Energy B.V., Netherlands
By order of DELTA Energy B.V., the Dutch location of MWM set up one of Europe’s largest gas engine plants, which supplies a 126-acre greenhouse array in Zeeland, Netherlands, with heat and electricity.
Greenhouse Complex Sayuri, Russia
Despite the extreme outdoor temperatures, the Sayuri greenhouse facilities in Siberia serve the year-round production of fruits and vegetables for the inhabitants of Yakutsk, Russia. An MWM TCG 2020 V20 gas engine, which bears the main load, and two Cat G3516 power gensets ensure the ongoing secure power supply of the greenhouse complex.
Greenhouse Kwerkerij Darolin, Brakel, Netherlands
The nursery uses about half of the power that is generated, and the other half goes straight back to the grid.
Greenhouse Van der Knaap, Berkel en Rodenrijs, Netherlands
As a company that covers almost 11 hectares, CHP is a highly cost-effective solution for the Greenhouse Van der Knaap.
Looije Tomaten B. V., Netherlands
The CHP plant supplies the greenhouse, not only with power and heat, but also with exhaust gas to promote tomato growth. Moreover, MWM manufactured a special noise insulation hood in order to comply with the strict noise protection standards.
Roland Bunnik Bromelia´s, Pijnacker, Netherlands
Van der Knaap opted for the best possible installation of the total energy systems. By paying ample attention to the casing, we’ve implemented an efficient, quiet and clean solution.
Turovskiy Greenhouse Complex, Moscow Region
In 2021, NEUHAUS – the MWM official distributor in Russia – put into operation a 8.0 MW CHP plant designed for heat and power supply of the greenhouse complex in the Moscow region. The power plant consists of original MWM containers with a heat recovery system.