Logistic Centre, Yaroslavl, Russia

Facts & Figures
| Genset/engine: | 1 х TCG 2020 V12 | 
| Segment/gas type: | Natural gas | 
| Customer: | Tander JSC | 
| Contractor: | Valdex Energetiсa LLC | 
| Total output: | 1.2 MWel / 1.2 MWth | 
| Commissioning: | 2018 | 
The power plant for Logistic Centre of Tander JSC is designed to provide electric and thermal power to consumers of the logistic center. The main generating equipment is a MWM gas genset TCG 2020 V12 in a container module with an electric capacity of 1.2 MW, voltage of 10.5 kV, with a recovery system and thermal capacity of 1.22 MW. The plant is operated all year round round-the-clock, in island and combined modes in parallel with an external grid without cross flows.




































